Assignment

Equipment utilization study

Yellow excavator working on a dusty earthworks bench

On-site review of how haul trucks, loaders, and crushers spend a shift, with charts that show idle time, wait at the face, and productive hours.

Format
Field visit plus written study
How we quote
Quoted after a short scoping call; typical studies cover 5–10 working days on site
Typical span
Two to four weeks from first visit to bound report
Where
Open-pit and quarry sites across Vietnam, with briefing meetings in Ho Chi Minh City

Who this is for

Mine superintendents, plant managers, and owners who need a clear picture of how the fleet actually works, not a software login.

What you receive

A bound utilization report with shift charts, delay categories, and a meeting to walk the findings with the operations team.

Included

Outside this assignment

Who does the work

A Panel Birchhub field analyst paired with a mining engineer for the findings meeting

How the study proceeds

  1. Scoping call to confirm which benches, fleets, and shifts to watch
  2. On-site observation and collection of existing shift sheets
  3. Charting of output tonnes and equipment hours
  4. Findings meeting at the site office or at our Binh Chanh rooms

What to prepare

Share recent shift sheets, a pit map, and names of the shift bosses who can walk the circuit with us.

Limits we work within

Night shifts and blasting windows may limit observation hours; we schedule around them rather than asking crews to change the plan.

Request a study date through the contact form, naming the site and the fleet you want reviewed.